AYAN PALACE

Home Page Products AYAN PALACE

AYAN PALACE

Project: Tovuz Ayan Palaz
Project period: Oktyabr – Noyabr 2020
Scope of Work: Design, supply and installation of pumping system

About the Project
Between October and November 2020, Element Construction MMC successfully completed the design, supply, and full installation of a central pumping station system for Ayan Palaz, located in Tovuz, Azerbaijan.

The main objective was to establish a reliable pumping infrastructure to ensure uninterrupted water circulation and stable system operations for the facility. The project was executed in compliance with modern engineering standards and included the following key steps:

Key Scope of Work:

- Technical planning of the pump room based on project requirements
- Selection and installation of pumps to support water circulation
- Full integration of electrical connections and automation systems
- Installation of safety and pressure control devices
- Commissioning of the entire system and handover in fully operational condition

The project was completed efficiently and to a high standard of quality, reinforcing Element Construction’s commitment to excellence in MEP infrastructure delivery.

Contact

Contact

Write to us

We will reply you as soon as possible. Fill the forum below to contact us

Mobile Phone

+994 50 660 60 06

E-mail

sales@emt.az

Address

4 Rovshan Aliyev Street, Narimanov District, Baku